Reflecting Pool job failed in 85 places – and contractor's report blames Trump's rush
The Raw Story · 1 hour ago

The Virginia company that resurfaced the Lincoln Memorial Reflecting Pool under a $14.7 million no-bid contract botched the job in at least 85 places, according to an inspection report the contractor commissioned. The 75-page “failure analysis,” completed Aug. 6 by Atlantic Coating Inspection,…
Continue reading at The Raw Story →












